Introduction:-
In ppap the supplier is required to perform a production process with specified documents to achieve product approval for production.
The automotive industry action group (AIAG) has developed a common ppap standard ( 4th edition 2006 )
It is one of 5 core tools (APQP,PPAP,SPC,MSA,FMEA)
PPAP is a process for the supplier not for the customer the ppap submission is an event for the customer to review and approval.
Why Ppap?
To demonstrated that supplier have met customers requirements and ready for production quality and delivery.
To ensure the a supplier cameet the manufacturability and quality requirements of the parts supplied to the customer.
To provide evidence that the customer engineering design record and specification requirements are clearly understand and fulfilled by the supplier.
Ppap submission requirements.
Requirements of total 19type.
1. Design record
2. Engineering change documents, if any
3. Customer engineering approval,if any
4. Desi FMEA
5. Process flow Diagram
6. Process FMEA
7. Control Plan
8. Measurement System Analysis Studies
9. Dimensional Results
10. Material performance test results
11. Initial process Studies
12. Qualified laboratory documentation
13. Appearance approval report (AAR ) if application
14. Sample product
15. Master sample
16. Checking Aids
17. Records of compliance with customer specific requirements
18. Parts submission warranty
19. Bulk material check list